Gadsden County Board of County Commissioners
INVITATION TO BID (ITB) FOR CONSTRUCTION OF HURRICANE SPECIAL NEEDS SHELTER RETROFIT ITB Number: 26-12 The project is funded through the Florida Division of Emergency Management (DEM), Legislative Appropriation. Grant Number F00100 https://www.gadsdencountyfl.gov/home Bids & ITBs | Gadsden County, FL (gadsdencountyfl.gov)
• Gadsden County does not discriminate on the basis of race, color, national origin, sex, religion, age, marital status and disability/handicapped status in employment or provision of service.
• Gadsden County is an Equal Opportunity Employer
• MBE/WBE businesses are encouraged to participate
• Gadsden County strictly enforces open and fair competition ADA - Special Accommodations: Any person requiring accommodation by the County due to a disability should call the Purchasing Office at 850-875-7243 or 850-627-4053 at least five (5) business days prior to any pre-response conference, response opening, or meeting. If you are hearing or speech impaired, please contact the County Purchasing Office by the Florida Relay Service, which can be reached at 1-800-955-8771 (TDD).
ITB 26-12 Construction Special Needs Shelter Intent and General Information
ITB 26-12 Construction Special Needs Shelter Att 1 Instructions and Proposal Construction
26-12 Forms and Certifications
ITB 26-12 Construction Special Needs Shelter Att 3 Agreement- MOD#1 03-25-2025
ITB 26-12 Construction Special Needs Shelter Att 4 Engineering Study March 12 2024
ITB 26-12 Construction Special Needs Shelter Att 5. Engineering Drawings - Specifications
26-12 Addendum #1 -Pre Bid Conference
26-12 Addendum #2 -Schedule of Events
26-12 Addendum #3 -Schedule of Events
2425301 Revised Electrical Drawings, 11-18-25, Signed
26-12 Addendum #4 -Revised Attachments
ITB 26-12 Construction Special Needs Shelter Att 2 Form 23 Bid_Basis_Form_
ITB 26-12 Construction Special Needs Shelter Att 2 Form 4-22 Revised
ITB 26-12 Construction Special Needs Shelter Draft Contract Revised
Addendum #5 ITB 26-12 Construction Special Needs Shelter Intent and General Information
Addendum #5 ITB 26-12 Construction Special Needs Shelter Att 1 Instructions and Proposal Construction
Addendum #5 Forms 1-22
Addendum #5 Electrical Study. Revised
Addendum #5 Electrical Specifications Permit Issue
Addendum #5 Bid Basis Form
Addendum #5 Questions and Responses
26-12 Addendum #5 -Schedule of Events
ITB 26-12 Special Needs Shelter Addendum #5
Addendum #6 Questions and Responses